My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-14_PERMIT FILE - M2016010 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
2016-07-14_PERMIT FILE - M2016010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 10:56:21 AM
Creation date
7/20/2016 12:14:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Date
7/14/2016
Doc Name
Adequacy Review Response
From
Transit-Mix Concrete Co.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> o Transit Mix Concrete Co. <br /> 1. Comment: Please provide a geotechnical stability analysis for the following stockpile <br /> and backfill locations as required by Rule 6.5 of the Mineral Rules and Regulations of <br /> the Colorado Mined Land Reclamation Board for the Extraction of Construction <br /> Materials. <br /> a. TS 1 - Topsoil Stockpile <br /> b. F 1 - Fines/Overburden Stockpile <br /> c. F3 -North Pit Backfill Area <br /> Response: See separate Stockpile Stability Assessment memorandum included in <br /> Exhibit 6.5. <br /> 2. Comment: Please provide the material placement procedure and testing protocols for <br /> the following stockpile and backfill locations as required by Rule 3.1.5 of the Mineral <br /> Rules and Regulations of the Colorado Mined Land Reclamation Board for the <br /> Extraction of Construction Materials. <br /> a. TS 1 - Topsoil Stockpile <br /> b. F 1 - Fines/Overburden Stockpile <br /> c. F3 -North Pit Backfill Area <br /> Response: See separate Stockpile Stability Assessment memorandum included in <br /> Exhibit 6.5. <br /> 3. Comment: Please explain how the downhill toe of the TS 1 - Topsoil Stockpile and F 1 - <br /> Fines/Overburden Stockpile will be stabilized to prevent potential downgradient movement <br /> of the stockpiles. Please provide geotechnical investigation data and details for the starter <br /> dam/embankment/retaining wall design, if available. <br /> Response: See separate Stockpile Stability Assessment memorandum included in <br /> Exhibit 6.5. <br /> 4. Comment: Please provide the material placement procedure and testing protocols for the F2 <br /> -North Pit Expansion Area backfill as required by Rule 3.1.5 of the Mineral Rules and <br /> Regulations of the Colorado Mined Land Reclamation Board for the Extraction of <br /> Construction Materials. <br /> Response: See separate Stockpile Stability Assessment memorandum included in <br /> Exhibit 6.5. <br /> 5. Comment: Please provide parallel and perpendicular cross-sections for the TS 1 - Topsoil <br /> Stockpile, F 1 - Fines/Overburden Stockpile, F3 -North Pit Area Backfill and F2 -North Pit <br /> Expansion Area for Mining Phases 1 through 6. <br /> Response: See separate Stockpile Stability Assessment memorandum included in <br /> Exhibit 6.5. <br /> Hitch Rack Ranch Quarry (M-2016-010) <br /> Response to Comments—July 14, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.