Laserfiche WebLink
r <br /> o Transit Mix Concrete Co. <br /> intercept groundwater, if present. Per their recommendations,one well should be located <br /> along the western boundary of Section 16, 500-1,000 feet south of Little Turkey Creek. <br /> The other well should be located along the eastern boundary of Section 16, or perhaps <br /> along the existing roadway, 500-1,000 feet south of Little Turkey Creek. BBA <br /> recommends that monitoring include monthly water level measurements and at least two <br /> analyses of water quality(during spring runoff and during fall or winter)to establish <br /> baseline conditions. BBA recommends these wells be completed outside of the creek <br /> fault zone. Has the applicant installed the recommended wells or have plans to do so <br /> before disturbing the area south of Little Turkey Creek?The Division agrees that <br /> installing deeper wells(outside of the creek fault zones)would be beneficial in <br /> monitoring impact to water levels of the basement rock groundwater system. The <br /> applicant should consider including these wells in the required groundwater monitoring <br /> program. <br /> Response: The proposed Water Monitoring Plan is included in Exhibit G. The <br /> Plan includes monitoring surface water quality and quantity along Little Turkey <br /> Creek and Deadman Creek and monitoring water quality and groundwater levels <br /> along the creek fault zones using monitoring wells. Groundwater is not expected to <br /> be encountered outside of the fractured areas,actual impacts of mining will be <br /> monitored with the proposed monitoring wells and the location previously discussed <br /> for the monitoring wells outside the productive fractured areas is difficult to access. <br /> For these reasons,Transit Mix is not currently pursuing the monitoring wells <br /> outside of the fractured areas and will rely on the proposed monitoring wells within <br /> those areas near the creeks to monitor groundwater impacts. <br /> Proposed Water Uses, Operations and Demands <br /> 171) Comment: Per Rule 6.4.6(1), you must provide an estimate of the project water <br /> requirements including flow rates and annual volumes for the development, mining,and <br /> reclamation phases of the project. The applicant gave an estimated volume for the mining <br /> phases(30 acre-feet/year);however,no estimate was provided for the reclamation <br /> phases. Please provide this estimate. <br /> Response: Reclamation will occur using native species adapted to the area climate, <br /> and no irrigation is anticipated. <br /> 172) Comment: The text states that sanitary return flows will be contained in a vault or <br /> storage tank on site,then pumped and transported off site for disposal. Please describe <br /> here or show on one of the figures submitted the estimated location of the proposed vault <br /> or storage tank. <br /> Response: There will be one vault located at the scale house and one vault located <br /> at the shop facility in the plant. These will be shown on the figures in Exhibit L. <br /> These exhibit will be included in a revised permit submittal provided to CDRMS on <br /> or prior to July 22,2016. <br /> Hitch Rack Ranch Quarry(M-2016-010) <br /> Response to Comments—July 14, 2016 <br />