My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-18_REVISION - M1982141 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982141
>
2016-07-18_REVISION - M1982141 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:18 PM
Creation date
7/19/2016 8:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982141
IBM Index Class Name
Revision
Doc Date
7/18/2016
Doc Name
Technical Revision
From
Moffat Limestone
To
DRMS
Type & Sequence
TR4
Violation No.
MV1992012
Email Name
ACY
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E: Reclamation Plan South Pit <br /> When we took over the pit, there was a reclaim area of approx. 2.59 acres on the South border. <br /> Since taking over,we have started reclaim of 1.6acres on along the East side of the active mining <br /> area. This reclaim will be going from East to West, then from previous reclaim, it will encompass <br /> or join each other to the North and continue following the active mining area. <br /> With active mining ongoing from West to East/North East,we will be moving our processing <br /> equipment to the East to stay in close proximity to the gravel high wall. As this happens, the <br /> ground not being used on the west side of the permitted area will be reclaimed allowing us to <br /> operate in 20 to 25 acres or less disturbed acres with an on-going mining and reclamation activity. <br /> There is a little brush or topsoil on these gravel deposits. In some pockets, it is deeper than other <br /> areas. The amount that is there will be collected, put in a topsoil pile and re-spread over the <br /> disturbed area after mining is complete. <br /> After the brush topsoil mixture has been spread over the disturbed area, we will seed that area with <br /> a mixture of grass seed as per NRC recommendations. (See Attached) <br /> All high walls and slopes will be reduced to a 3-1 slope during reclamation by adding fines and <br /> over burden to die area that is not delighted through the mountain. <br /> The sediment pond will be maintained throughout the entirety of the permit area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.