Laserfiche WebLink
Exhibit D: Mining plan South Pit. <br /> Currently the South pit has a Crushing, Screening& Stockpile area of acres, as noted on Map. <br /> Active mining area plan is to proceed to the South into the High Wall with planned benching with <br /> 3-1 slopes. <br /> Once active mining has reached its southern most boundaries, it will be left at a 3-1 slope for <br /> reclaim. <br /> The same technique will be used to proceed to the East onto future mining area of 1.55 acres. All <br /> stockpile will be left on active mining area. <br /> Retention pond at the bottom of the South Pit entrance hill will be maintained for run off. <br />