Laserfiche WebLink
Exliibit L: Rechunation Phin South Pit <br />When we tool: over file pit, there was a reclaim m -ca ol' approx. 2.59 acres on rile South border. <br />Since taking over, %ve have started reclaim of 1.6;tcres on ;don,,- die Last side ol' rile active mining <br />arca. This reclaim will be going from Last to Nest, Hien From previous reclaini, it will encompass <br />or join each oilier to tic Norlli and continue Following rile active mining .u•ca. <br />with active mining ongoiIlg from Nest to l:,ist/ North Ewst, we will be 111OVnlg Our processiIlg <br />equipmeIlt to die East to stay" in clo.,c proximity to File a'Tavcl hl:;h wall. As this happens, die <br />ground not being used on the west side of llic permitted arca will be reclAinled Allowing us to <br />operate in ` 0 to `>> Acres or less disturbed acres with qui on-goin mining' -mid reclamation activity. <br />There is it little brush or topsoil on these gravel deposits. In some pockets, it is deeper lfrul oilier <br />areas. The amount that is lucre will be collected, put in a topsoil pile wid rc-spread over die <br />disturbed arca niter minim; is complete. <br />Alter die brush topsoil mixture has been spread over the disturbed arca, we will seed dint arca witli <br />a mixture of g -n ss seed as per NRC reconinlcndations. (Sec Attached) <br />All high walls and slopes will be reduced to a 3-1 slope during rechunadon by adding lines and <br />over burden to rile arca that is not delighted through die mountain. <br />'rhe sediment pond will be imiintciined 1lirougliout die entirety- of* die pcnilit arca. <br />