Laserfiche WebLink
I"Allibit D: Mining plan South Pit. <br />Currendy the SOLltll pit has a Crushing, Screening & Stockpile arca of acres, as note(] on Map. <br />Acdve milting area pian is to proceccl to the Soutll into [lie I-Iig]l NL'all %vitll p1mined bcncllUla will <br />3-1 slopes. <br />Once active mining bas readied its southerIl most boun(larics, it will be leftat a 3-1 slope for <br />reclaim. <br />'nic s:ullc tccluli(fue will be used to proceed to lllc East onto future mining arca OI'l.55 acres. All <br />stockpile will be left on active elinin¢ arca. <br />Retention pon(] at tllc bottom of the Soutll Pit entnuice N11 will be entuntaillcd for run off. <br />