My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-13_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
2016-07-13_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2020 11:18:16 PM
Creation date
7/14/2016 3:00:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
General Documents
Doc Date
7/13/2016
Doc Name
New Reagent Testing
From
Lazuk Raymond
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f , <br /> OF <br /> STATE Stt-DNR, Eric<eritt state.co.us> <br /> }' COLORADO co c.sco@ <br /> Cytec New Reagent S-11194 Frother testing at Climax <br /> 1 message <br /> Lazuk, Raymond <riazuk@fmi.com> Wed, Jul 13, 2016 at 1:47 PM <br /> To: "Scott - DNR, Eric" <edc.scott@state.co.us> <br /> Cc: "Hilshorst, Aaron" <ahilshor@fmi.com> <br /> Hi Eric, <br /> Metallurgy would like to run another test on a newer version of the frother S-11194 that we ran a test on earlier this year. <br /> I am attaching the new SDS as well as the email I sent you back in April. The attached, new SDS has more <br /> information on the ingredients and toxicity than the previous SDS in the attached email. The specifics of the testing are: <br /> 1. Dosage. We are expecting to use —125-250 cc/min at the cyclone overflow and —10-50 cc/min at TK-053 (4 rougher <br /> flotation cell). A maximum of 300 cc./min total. In both cases we will use a LMI pump to add the frother to the circuit. <br /> 2. Store on Site. We are going to buy 1 tote = 1000 m3 or 275 gal. The tote will last approximately 6-7 days at 125 <br /> cc/min current frother dosage. <br /> 3. Location. The tote will be stored on top of the second containment at the cyclone deck, SDS will be attached and area <br /> will be barricaded off to notify everybody about the test. <br /> 4. Delivery. The new frother tote is expecting to be here before August 1st, 2016. The test will start on August 1st,2016 <br /> for 6 to 7 days. If there are any issues with this reagent will discontinue the test and dispose of the remaining in <br /> accordance with waste regulations. <br /> Please let us know if you have any concerns with Climax conducting this testing. We will not proceed until we hear <br /> back from you. <br /> Thanks, <br /> - Ray <br /> Raymond Lazuk <br /> Environmental Manager <br /> Climax Molybdenum Company <br /> Climax Mine <br /> HWY 91 - Fremont Pass <br /> Climax, CO 80429 <br /> Office: 719-486-7584 <br />
The URL can be used to link to this page
Your browser does not support the video tag.