Laserfiche WebLink
3.3 Planned Disturbances/Reclamation for 2015— 2016 <br /> No new disturbances are planned for the 2015 — 2016 reporting period. <br /> In the 2016 field season both the Lower Pump Station and the Upper Pump Station pad will be <br /> re-contoured and reclaimed. All of the ground water monitoring well pads and roads will be <br /> reclaimed and the main well field road will be reclaimed. <br /> Reclamation success will be monitored periodically and vegetation control for noxious weeds <br /> will continue in the growing season as native plants stabilize the disturbed areas. <br /> f. <br /> 40 <br /> t <br /> PHOTO 25 - Near the center of the photo is the ridge top where production well 29-27 was reclaimed in 2015. <br /> The lighter color of soil is easily visible where the cast over slope was brought back up to re-contour the <br /> mountain top. On the next ridge back, on the right side of the photo, production well 29-22 was reclaimed in <br /> 2014. Wind and weather have faded the contrasting colors of rock and soil and blended them so that the former <br /> well pad is difficult to identify. <br /> Solvay Chemicals, Inc.. 32 <br /> DRMS Annual Report <br /> July 8, 2016 <br />