My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-12_REPORT - M1999002
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999002
>
2016-07-12_REPORT - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2020 10:59:49 PM
Creation date
7/13/2016 2:49:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
7/12/2016
Doc Name
Annual Fee/Report/Map
From
Yankee Gulch Minerals Project
To
DRMS
Annual Report Year
2016
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29-78 Plugged and 10/22/14 LS Well pad and road contoured and reseeded. Approximately <br /> Abandoned 10/25/06 SS 0.57 acres reclaimed in 2015. <br /> Table 3 Color Key: <br /> Production Well Plugged and Abandoned—Lateral Road and Pad Re-contoured and Reclaimed <br /> Ground Water Monitoring Well Plugged and Abandoned—Access Road and Pad Planned for <br /> Reclamation 2016. <br /> Production Well Plugged and Abandoned—Reclamation of road or pad is pending—other structure <br /> interference such as wells drilled on Test Mine Pad or near TDR well. <br /> 00 , <br /> - A <br /> �• a!> <br /> y � <br /> J <br /> a <br /> r JAM <br /> 1 <br /> 1S <br /> PHOTO 24- RACs crew on location at ground water monitoring well 29-4(U,A, and D). A modified coil tubing <br /> injector head sits on top of the well casing. The ground water monitoring wells are all two inch diameter <br /> casings. First the well level PVC line is removed. This is a small threaded line that extends from the surface to <br /> the water level so that the well sounding level tape does not get stuck in the tubing or wire line holding the <br /> pump. Then the nitrogen gas displacement pump and tubing are pulled out of the well. In several of the <br /> monitoring wells removing the equipment in place in the well was very difficult. Photo January 2016. <br /> Solvay Chemicals, Inc.. 31 <br /> DRMS Annual Report <br /> July 8, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.