Laserfiche WebLink
Photo 17 shows the Upper Pump Station pad after the building was removed. In this photo <br /> you can see the ancillary equipment, the tank, flare, piping and cement block motor control <br /> (MCC) structure still remaining. A red bear-proof 20 yard waste bin is sitting on the cement <br /> pad where the metal Upper Pump Station building was removed. This pad is approximately 0.3 <br /> acres and is scheduled for reclamation in fall 2016. <br /> •F <br /> .n . <br /> w 4 q <br /> 77!!ryry" �F <br /> d <br /> ^^ 'alp <br /> Al 2 <br /> . v <br /> ..0 r <br /> w. <br /> _ , # J y ♦ fly. ,vW+��y <br /> ,.,, }... S ^� �, � ��• gy�ii � -WW.,� <br /> Photo 17—The Upper Pump station building location after the metal building was removed. Work is in progress <br /> to demolish and remove all of the remaining ancillary structures. The remaining cement will be broken up and <br /> incorporated into the re-contouring of the pad as it is reclaimed. Photo June 2016. <br /> Solvay Chemicals, Inc.. 18 <br /> DRMS Annual Report <br /> July 8, 2016 <br />