Laserfiche WebLink
July 5, 2016 C-1996-083/Bowie No. 2 Mine JDM <br />rotation and will be placed along a uniform grade from the east side at the gob #4 tie in to the east side in <br />anticipation of winter. The processed coal waste is being transported to gob #3. <br />Gob #2 dried gob stockpiled on east side of pile <br />Bench 4 Gob #2/Gob #4 tie-in <br />Soil placement on Gob #2 outslope Graded outslope of Gob #2 <br />Groh Pile #3 <br />Material was not being stockpiled at the time of the inspection. A small amount of processing waste from the <br />clean-out of the plant was stockpiled on the pile. The under -drain was discharging at the time of the inspection <br />with a trickle discharge. No problems were noted. <br />Gob Pile 44 <br />Reclamation of the west side of Gob Pile #4 is completed. Cover material is placed on the three lower benches <br />that have been backfilled and graded to final configuration. The upper bench remains open for additional refuse <br />placement. Topsoil has been placed and erosion control mat is in place. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 4 of 6 <br />