My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2016-07-11_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:24:41 PM
Creation date
7/13/2016 8:59:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
7/11/2016
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
7/5/2016
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 5, 2016 C-1996-083/Bowie No. 2 Mine <br />JDM <br />Pond C with heavy algae growth <br />Pond D <br />Active Gob #2 run-off reports to Pond F and Gob #3 run-off reports to Pond J. Both Pond F and J were stable <br />with no in -flow to the ponds at the time of the inspections. <br />.. <br />F Y <br />� YL--s+,eW •� <br />Pond F Pond J <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br />Due to the idle condition of the site, gob placement will be minimal moving forward. <br />Gob Pile #1 <br />Gob Pile #1 has been inactive. Technical Revision No. 97 was approved and provides a variance from the <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile #1 where the slope was identified as being greater than 2:1. <br />Backfilling operations have been completed at Gob #1. <br />Gob Pile 42 <br />Gob Pile #2 was dry and compacted in areas with active grading operations ongoing. Outslopes of bench #3 have <br />been graded to the start of bench #4. The slopes are stable with no signs of instability. Soil lay -down is <br />anticipated this summer and tied into gob #4. The stockpiled material on the west end was in the process of <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.