Laserfiche WebLink
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02776-O.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> high, safety measures shall be put into place to prevent the rolls from shifting and <br /> personnel from climbing on the rolls to access the lifting straps. <br /> 1.5. Site Conditions <br /> A. Geomembrane Deployment <br /> 1. Do not proceed with deployment at an ambient temperature below 14' F or above <br /> 100' F unless otherwise authorized, in writing, by MANAGER, DESIGN ENGINEER, <br /> and CERTIFYING ENGINEER. Temperature monitoring shall be performed by the CQA <br /> Monitor. <br /> 2. Do not deploy during precipitation, in the presence of excessive moisture (e.g. fog, <br /> dew), in an area of ponded water, or in the presence of excessive winds. Do not <br /> undertake deployment if weather conditions will preclude material seaming on same <br /> day as deployment, unless approved by MANAGER, DESIGN ENGINEER, and <br /> CERTIFYING ENGINEER. . <br /> B. Seaming <br /> 1. Normal Weather Conditions <br /> Normal seaming procedures may take place if the following weather conditions exist: <br /> a. Ambient temperature between 35' F and 100° F. <br /> b. Dry conditions, i.e., no precipitation or other excessive moisture, such as fog or <br /> dew. <br /> c. No excessive winds. <br /> 2. Adverse Weather Conditions <br /> a. Do not seam if ambient temperature is below 14' F or above 100° F. <br /> b. Do not seam during precipitation, in the presence of excessive moisture (e.g. <br /> fog, dew), in an area of ponded water, in the presence of excessive winds. <br /> c. If the ambient air temperature is between 35' F and 14' F for the entire shift, <br /> Cold Weather Seaming provisions will govern. <br /> 1. The INSTALLER will be required to perform a minimum of four trial seams <br /> during the planned work shift, at approximately the same time interval <br /> throughout the scheduled workday. <br /> 2. If the Soil Liner Fill is considered frozen as outlined in Item 3.06 of Section <br /> 2200, the INSTALLER must place seaming boards or slip sheets when <br /> seaming. Seaming boards or slip-sheets shall be removed by INSTALLER. <br /> Page 7 <br />