My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02776-O.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> C. Thickness <br /> d. Roll number <br /> e. Batch or lot number <br /> f. Panel number(when applicable) <br /> g. Roll dimensions <br /> 2. CONTRACTOR shall ensure that geomembrane rolls are properly loaded and secured <br /> to prevent damage during transit. <br /> 3. CONTRACTOR shall protect geomembrane from excessive heat, cold, puncture, <br /> cutting, or other damaging or deleterious conditions. <br /> 4. CONTRACTOR shall ensure personnel responsible for loading, transport and <br /> unloading of geomembrane are fully aware of the consequences of damage to <br /> geomembrane, and are familiar with handling and transport constraints imposed by <br /> MANUFACTURER <br /> B. Acceptance at Site <br /> 1. CQA Monitor shall perform inventory and surface inspection for defects and damage <br /> of all geomembrane rolls upon delivery. <br /> 2. CONTRACTOR shall unroll and inspect any geomembrane roll that may be damaged <br /> below surface. <br /> 3. CONTRACTOR shall repair damage resulting from handling and transport of <br /> geomembranes at no additional cost to CC&V. If irreparable, in the opinion of <br /> CERTIFYING ENGINEER, damaged materials shall be replaced at no additional cost to <br /> CC&V. <br /> C. Storage and Protection <br /> 1. MANAGER will provide area for on-site storage of the geomembrane rolls from time <br /> of delivery until installation. <br /> 2. The storage and handling of the materials is the responsibility of CONTRACTOR from <br /> the time the materials are manufactured until the time the completed installation is <br /> accepted. CONTRACTOR is responsible for preparing the storage location and for the <br /> protection of the materials from the elements (e.g. ultraviolet light, moisture, <br /> temperature, etc.). <br /> 3. After CONTRACTOR has removed material from storage, CONTRACTOR shall protect <br /> geomembrane from puncture, dirt, grease, water, moisture, mud, mechanical <br /> abrasion, excessive heat, and other sources of damage. <br /> 4. CONTRACTOR shall preserve integrity and readability of the geomembrane roll <br /> labels, and store the rolls such that MANAGER and CERTIFYING ENGINEER have <br /> access to the package slips or roll labels for each roll to verify roll acceptance. <br /> 5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not <br /> be stacked more than three rolls high. If the rolls are stacked higher than two rolls <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.