Laserfiche WebLink
Newrnont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400-2.00CX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> notify the MANAGER and CERTIFYING ENGINEER who will assist in problem resolution. If the <br /> solution involves a design revision,the DESIGN ENGINEER shall also be contacted. <br /> The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING <br /> ENGINEER before any additional related work is performed by the INSTALLER or CONTRACTOR. <br /> All retests and related documentation shall be recorded by the CQA Monitor and included <br /> in the final Construction Certification Report. <br /> 5. PARTS: MEETINGS <br /> This section identifies and describes the meetings to be held during the course of the <br /> construction. Meetings shall be held in order to clearly define construction activities and <br /> goals in order to facilitate construction. <br /> 5.1. Preconstruction Meeting <br /> The MANAGER will hold a preconstruction meeting at the site prior to the start of construction. <br /> The DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA Monitor, INSTALLER, <br /> CONTRACTOR, and others designated by the MANAGER shall attend this meeting. The <br /> purpose of this meeting will be to: <br /> ■ review the construction DRAWINGS, CQA Plan, and project SPECIFICATIONS; <br /> ■ define the responsibilities of each party; <br /> ■ define lines of communication and authority; <br /> ■ review method of documentation, testing procedures, and reporting inspection data; <br /> ■ establish testing protocols and procedures for correcting and documenting construction <br /> deficiencies; <br /> ■ discuss any changes that may be needed to ensure that construction will be completed <br /> in compliance with the design; and <br /> ■ This meeting will be documented by the MANAGER or his designee and copies distributed <br /> to all parties. <br /> 5.2. Progress Meetings <br /> The MANAGER will hold a daily progress meeting, either before the start of work or at the <br /> completion of work. At a minimum, this meeting will be attended by the CQA Monitor, <br /> INSTALLER and CONTRACTOR. The purpose of this meeting will be to: <br /> ■ review all the previous day's accomplishments and activities; <br /> ■ review scheduled work location and activities for the day; and, <br /> Page 5 <br />