My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400-2.DOCX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> must verify prior to construction that the MANUFACTURER can produce material that meets <br /> the requirements outlined in project SPECIFICATIONS. <br /> 2.7. Geosynthetics Installation Contractor <br /> The Geosynthetics Installation Contractor, also referred to as the "CONTRACTOR" or <br /> "INSTALLER", is responsible for installation of the geosynthetic components, as outlined in the <br /> project SPECIFICATIONS. <br /> The INSTALLER must meet the requirements outlined in the project SPECIFICATIONS. <br /> The INSTALLER will be responsible for storage, handling, deploying, temporary geomembrane <br /> anchoring, seaming, repairs and non-destructive testing, in accordance with the project plans, <br /> SPECIFICATIONS and the Installer's internal quality control program. It is the Installer's <br /> responsibility to see that all submittals are received as outlined in the project SPECIFICATIONS. <br /> 2.8. Earthworks Contractor <br /> The Earthworks Contractor, also referred to as "CONTRACTOR" is responsible for proper <br /> delivery and placement of earthwork components as outlined in the project SPECIFICATIONS. <br /> 3. PART 3: LINES OF COMMUNICATION <br /> The CQA Monitor shall be capable of direct communication with the MANAGER, DESIGN <br /> ENGINEER, CERTIFYING ENGINEER and CONTRACTOR at all times. Deficiencies that can be <br /> easily remedied, such as unsatisfactory test results, will be dealt with directly between the <br /> CQA Monitor, INSTALLER, and/or CONTRACTORS. <br /> If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br /> MANAGER that cannot be resolved among themselves, MANAGER shall present the matter to <br /> CC&V with MANAGER related recommendations and CC&V shall decide the matter with such <br /> decision being final. <br /> 4. PART 4: DEFICIENCIES <br /> When deficiencies (items that do not meet project requirements) are discovered, the CQA <br /> Monitor shall immediately determine the nature and extent of the problem and notify the <br /> INSTALLER or CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests <br /> will be performed to define the extent of the deficient area. <br /> The INSTALLER or CONTRACTOR shall correct the deficiency to the satisfaction of the CQA <br /> Monitor. If the CONTRACTOR is unable to correct the problem, the CQA Monitor will <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.