Laserfiche WebLink
Newmont-Cripple Creek&Victor Gold Mine ■ <br /> Technical Specification No.01400.DOCX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> 7.1. Daily Record Keeping <br /> Daily records kept by the CQA Monitor shall consist of field notes, observation and testing data <br /> sheets, summary of the daily meeting with CONTRACTOR, and reporting of construction <br /> problems and resolutions. The CQA Monitor shall submit this information on a regular basis to <br /> MANAGER for review. <br /> 7.2. Soils Observation and Testing Forms <br /> The CQA Monitor will document soils observations on forms that generally include the <br /> following information: <br /> ■ date, project name, location, and weather data, including high and low daily temperatures; <br /> ■ a site plan showing work areas and test locations; <br /> ■ descriptions of ongoing construction detailing work areas and equipment utilized by <br /> CONTRACTOR; <br /> ■ summary of test results and samples obtained, with locations and elevations; <br /> ■ resolutions of deficient test results; <br /> ■ test equipment calibrations, if necessary; <br /> ■ summary of meetings held; and <br /> ■ signature or initials of the CQA Monitor. <br /> 7.3. Photo Documentation <br /> The CQA Monitor shall photograph all phases of construction. Photographs shall be identified <br /> by location, time, date, and name of the CQA Monitor taking the photograph. <br /> 7.4. Design and Specification Changes <br /> During construction, the need to address DESIGN and SPECIFICATION changes, modifications, or <br /> clarifications may arise. In such cases the CQA Monitor shall notify MANAGER, which shall <br /> notify the DESIGN ENGINEER and the CERTIFYING ENGINEER. DESIGN and SPECIFICATION <br /> changes shall only be made with written agreement from MANAGER and DESIGN ENGINEER. <br /> 7.5. Weekly Progress Reports <br /> The CQA Monitor shall prepare weekly progress reports summarizing all construction and <br /> quality assurance activities. This report shall be submitted to MANAGER and shall include the <br /> following information: <br /> ■ date, project name, and location; <br /> Page 8 <br />