My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine ?■ <br /> Technical Specification No.01400.DOCX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> 6.2.2. Placement Of Materials <br /> During placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented <br /> Rockfill, Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, <br /> Soil Liner Fill, Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material and Granular Filter <br /> Material, the CQA Monitor shall: <br /> ■ verify the use of appropriate fills; <br /> ■ monitor and document material placement, including soil type, particle size, loose lift <br /> thickness, moisture conditioning process, compaction equipment and methods used to <br /> attain compaction, including number of passes, uniformity of compaction coverage, <br /> compacted lift thickness, bonding of lifts and in-place moisture content and dry density is in <br /> compliance with the SPECIFICATIONS; <br /> ■ monitor Soil Liner Fill surface preparation to verify that the surface has been proof-rolled, <br /> compacted, or hand worked so as to be in a condition suitable for geomembrane <br /> installation as discussed in Section 02200 of the SPECIFICATIONS; <br /> ■ monitor Bedding Fill placement and surface preparation to verify that the surface is suitable <br /> for geomembrane installation as discussed in Section 02200 of the SPECIFICATIONS; <br /> ■ monitor the placement of fill to ensure that CONTRACTOR exercises care in the vicinity of <br /> pipes and that the underlying geosynthetics are not damaged; <br /> ■ monitor and document CONTRACTOR verification of in-place Soil Liner Fill, Bedding Fill, Low <br /> Volume Solution Collection Fill and Drain Cover Fill thickness; <br /> ■ monitor equipment being used to place Low Volume Solution Collection Fill and Drain <br /> Cover Fill to verify that the CONTRACTOR places the material in accordance with the <br /> SPECIFICATIONS; <br /> ■ monitor that Low Volume Solution Collection Fill and Drain Cover Fill is pushed uphill for <br /> areas in which the slope exceeds 4HAV and that the dozer does not perform unacceptable <br /> pivot turns; and <br /> ■ monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br /> 7. PART 7: DOCUMENTATION <br /> Documentation kept by the CQA Monitor shall consist of daily record-keeping, construction <br /> problem resolutions, design and SPECIFICATION changes, photographic records of construction, <br /> weekly progress reports, chain of custody forms for test sample tracking, and a Construction <br /> Certification Report. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.