Laserfiche WebLink
2' HAUL ROAD SETBACK <br />PSCo ROW BOUNDARY <br />— _ AUL ROAD SETBACK <br />------�------------- —--------- <br />3' ROAD DITCH <br />30' TYPICAL <br />HAUL ROAD SECTION <br />3' ROAD DITCH <br />24' HAUL ROAD <br />9"- 12" ROAD BASE <br />--------------------f---------------- <br />TYPICAL HAUL ROAD LAYOUT <br />3' DITCH DE 24' HAUL ROAD � � 3 RpITCHIDE <br />9"- 12"COMPACTED AGGREGATE <br />OR ROADBASE MATERIAL COMPACTED NATIVE SOIL <br />(MAXIMUM TOTAL ROADBASE FILL = 4800 CY) <br />TYPICAL HAUL ROAD SECTION <br />EDGE OF ROAD DITCH <br />EDGE OF ROAD DITCH <br />SHEET 2 Exhibit 2 <br />of 2 PSCo Right -of -Way Exhibit <br />44TH LANE PROJECT Fuq <br />ea rthl�� <br />Typical Haul Road Sections solutions Fol cw-"'c <br />DATE: 07.08.15 FREMONT PAVING <br />