June 23, 2016 C-1981-022/Elk Creek Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 2 of 9 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />N - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br /> <br />R - Roads <br />R - Reclamation Success <br />R - Revegetation <br />N - Subsidence <br />R - Slides and Other Damage <br />R - Support Facilities On-site <br />N - Signs and Markers <br />N - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a partial inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety <br />(Division). Doug Smith of Oxbow Mining accompanied the inspection. The weather was clear, dry and fine. <br />The status of the Elk Creek Mine, as far as the Division is concerned, is “Active” however no coal is being mined <br />and all activity at the site is focused on the early stages of reclamation. <br />The demolition contractors, Demco, still had 6 people left on-site, with work to break up concrete pads <br />continuing. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> All ponds were in good order and were holding a minimal amount of water. The ditches around the portal <br />bench had been cleaned. <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br /> There are no permitting actions in progress. The mine is currently being reclaimed in accordance with the <br />plan approved in the permit. <br /> <br />ROADS – Rule 4.03: <br /> The roads away from the main site were generally in reasonable condition, although those that are used <br />infrequently (like the road to GVB-LW3-02) were understandably more difficult to pass, with fallen rocks needing <br />to be cleared. The roads around the facilities were in good condition. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br /> The breaker building had been demolished and removed. The only remaining large structure to be <br />demolished was the loadout. There had been continued progress in the demolition of concrete pads.