My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-06_REVISION - M1990041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990041
>
2016-07-06_REVISION - M1990041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:28 AM
Creation date
7/7/2016 11:17:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990041
IBM Index Class Name
Revision
Doc Date
7/6/2016
Doc Name
Notice of Surety Increase
From
DRMS
To
Central City Consolidated Mining
Type & Sequence
SI3
Email Name
MAC
WHE
BJC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#003 Page 2 of 2 <br /> Job efficiency: _ 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 _ (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5784 <br /> Adjusted unit production: 809.76 LCY/hr <br /> Adjusted fleet production: 809.76 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s)_ <br /> Unit cost: $0.247/LCY <br /> Total job time: 1.23 Hours _ <br /> Total job cost: $247 <br />
The URL can be used to link to this page
Your browser does not support the video tag.