Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#003 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Stabilize Mill TailiAVs <br /> Site: Bates-Hunter Mine Permit Action: 2016 Bond Calculation Permit/Job#: M1990041 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 6/24/2016 County: Gilpin Filename: M041-003 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DST-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $82.01 NA <br /> Operating Cost/Hour: $79.23 100 <br /> Ripper own. Cost/Hour: $0.00 ! NA <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.89 NA <br /> Total unit Cost/Hour: $200.13 _ <br /> Total Fleet Cost/Hour: $200.13 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,000 <br /> Swell factor: 1.000 <br /> Loose volume: 1,000 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,400.0 LCY/hr <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push gradient: -5 % <br /> Average site altitude: 8,300 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock, 75%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.200_ (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />