Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: New Elk <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />CDMR Rule 4.05.9(17) <br />RDA Containment SE <br />None <br />First Quarter 2016 <br />03/16/16 <br />General Description or Reference to Site Plan: <br />This partially incised containment basin is a non -discharging facility designed to contain run-off <br />from the area east of the RDA belt conveyor and south of highway 12. <br />ALIJ.1NIXT114►j1 <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate(�eww) Poor <br />Extensive Some Few <br />Yes <br />re, <br />4). Erosion of the downstream toe of the embankment? Yes No <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />1"""i <br />SHA Glualified Impound ent Inspector <br />Date <br />No i/ <br />No <br />