Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: None <br />Inspection Period: First Quarter 2016 <br />Inspection Date: 03/16/16 <br />General Description or Reference to Site Plan: <br />Pond 6 is a non -discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean-out. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent Moderat ew Poor <br />2). Erosion forming Gullies: ExtensiveS m l Few None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No <br />4). Erosion of the downstream toe of the embankment? Yes No <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No� <br />Explain: <br />OTHER OBSERVATIONS: /w j2cn= <br />MG <br />MSHA Qualified Impoundm t Inspector <br />Date <br />