Laserfiche WebLink
feet wide by 40 feet long, (or 89 square yards). Based on RS Means costs for "minor site <br /> demolition, concrete 6 inches thick", (2016 RSMeans #02 41 13.30.4120), that would cost <br /> $11.40/square yard or $1,014.60 total. The project in whole will increase the reclamation costs <br /> by a total of$3,485.10. <br /> A check in the amount of$1,006 for this technical revision request is attached. <br /> A copy of this submission will be sent to Teller County as a No-Impact Technical Revision <br /> under Section 8.A.2 for the Teller County Land Use Regulations, Appendix A, Cripple Creek <br /> Mining Overlay District. <br /> Please contact me at (719)-934-4048 or Meg.Burt@Newmont.com should you have questions or <br /> wish to discuss this request for a technical revision. <br /> Regards, <br /> ut�,/ <br /> Meg Burt <br /> Sr. Environmental Manager <br /> Cripple Creek and Victor Mine <br /> Enclosures <br /> Ec Meg Burt <br /> Ron DiDonato <br /> Jeff Gaul <br /> Jody Keel <br />