Laserfiche WebLink
Newmont Mining Corporation <br /> 100 N.3r°Street <br /> PO Box <br /> 191 <br /> Sustainability and External Relations Victor,CO <br /> 8088080111 <br /> NE W M O N T T 79- 89- <br /> F 719-689-3254254 <br /> www.newmont.com <br /> SENT CERTIFIED, RETURN RECEIPT REQUESTED <br /> 7015-1660-0000-0779-7020 <br /> June 30, 2016 <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company ("CC&V"); <br /> Cresson Project; — Squaw Gulch Valley Leach Facility Specification Changes and High <br /> Grade Mill Grizzly/Conveyor Power Upgrade—TR#79 <br /> Dear Mr. Cazier, <br /> Please accept this submission of Technical Revision(TR)to the Cresson Reclamation Protection <br /> Plan. The revision is submitted to address changes to the Squaw Gulch Valley Leach Facility <br /> (SGVLF) Design and Construction Specifications (Specifications). On June 8, 2016,Newmont <br /> and its representatives met with DRMS to discuss the Specifications and each concurred on the <br /> changes. To minimize the number of submissions, DRMS suggested that we combine TR's, <br /> therefore we are also submitting changes to the High Grade Mill (HGM) Grizzly and Conveyor. <br /> The updated construction Specifications are attached to this submission and do not result in any <br /> increase to the Warranty Estimate. <br /> At the HGM Grizzly and Conveyor,power will be installed replacing the existing generator-run <br /> system. Attached are two drawings depicting the proposed project. The Google Earth image <br /> depicts the location of the buried powerline and the Green Electric drawing depicts the new <br /> concrete pad rack for equipment, and the three new 35 foot wooden utility poles with lights <br /> mounted to them. <br /> Grizzly Conveyor Warranty Estimate <br /> CC&V used the 2016 RS Means costs for calculating the increase in reclamation cost. The RS <br /> Means estimate for"electrical utility pole, wood 35 feet", (2016 RSMeans 433 71 16.33.5040) is <br /> $823.50 per pole for a total of$2,470.50. The concrete demolition is based on a 6 inch pad 20 <br />