Laserfiche WebLink
Aggregate Industries – WCR, Inc. <br />Page 3 <br />June 26, 2016 <br /> <br />6.4.6 EXHIBIT F - Reclamation Plan Map <br /> <br />10) The Reclamation Plan Map must include all features that will remain after mining. Please include <br />the following on the Reclamation Plan Map: <br />a. Agridrain <br />b. the rundown channel for the agridrain <br />c. the rundown channel for the permanent groundwater mounding mitigation plan <br /> <br />General Questions and Comments <br /> <br />11) The revised reclamation plan map, contains two new features that have not been <br />incorporated in previous permitting actions; the emergency spill way and the reservoir <br />outlet pipe. These two features are not direct responses to the Division’s adequacy review <br />questions. Therefore pursuant to Rule 1.8.1(4) the office has determined that the emergency <br />spill way and the reservoir outlet will need to be incorporated in to the approved permit as <br />a technical revision to the application in review. Please submit the technical revision to <br />the application in review as required by Rule 1.8. The technical revision will not be filed <br />until the Division receives proof of filing with the county clerk and recorder. The technical <br />revision to the application in review will open the public comment period for 20-days for <br />commenting agencies and interested persons. Commenting agencies and interested <br />persons can only respond to items being added in the technical revision, not any other <br />portion of the application. Therefore the decision deadline will be rescheduled and the <br />112c Amendment application No.1 with objections will be herd at a subsequent Board <br />hearing. Please note that there is no fee for a technical revision to an application in review. <br />In the technical revision please provide enough information; design drawings and <br />specifications, ect., so that the emergency spill way and the reservoir outlet pipe can be <br />reviewed for compliance with Rule 3 and Rule 6. <br />The decision deadline on AM-01 is June 29, 2016. If additional time is required to respond to these <br />adequacy issues please submit a written request for extension of the review period. The Division reserves <br />the right to further supplement this document with additional adequacy issues and details as necessary. <br /> <br />If you need additional information please contact me at the Division of Reclamation, Mining and Safety, <br />1313 Sherman St., Room 215, Denver, CO 80203, by telephone at 303-866-3567, extension 8131, or by <br />email at Tyler.ODonnell@state.co.us. <br /> <br />Sincerely, <br /> <br /> <br />Tyler O’Donnell <br />Environmental Protection Specialist <br /> <br />cc: Wally Erickson, DRMS