Laserfiche WebLink
June 22, 2016 C-1996-083/Bowie No. 2 Mine JDM <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br />Due to the idle condition of the site, gob placement will be minimal moving forward. <br />Gob Pile #1 <br />Gob Pile #1 has been inactive. Technical Revision No. 97 was approved and provides a variance from the <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile #1 where the slope was identified as being greater than 2:1 <br />Gob Pile #2 <br />Gob Pile #2 was dry and compacted in areas with no active grading operations. Outslopes of bench #3 have been <br />graded to the start of bench #4. The slopes are stable with no signs of instability. Soil lay -down is anticipated this <br />summer and tied into gob #4. The stockpiled material on the west end was in the process of rotation and will be <br />placed along a uniform grade from the east side at the gob #4 tie in to the east side in anticipation of winter. The <br />processed coal waste is being transported to gob #3. The Gob #2 collection ditch was cleared during the <br />inspection. <br />^� V <br />1` i E`� - �,•; mss,- �-'' �yg�tvru.tii-�5�"1� <br />Gob #2 Grading <br />Gob #2 Outslope at Bench 3 <br />Gob #2 Grading Gob #2 Bench 4 <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 6 of 10 <br />