Laserfiche WebLink
June 22, 2016 C-1981-038/Bowie No. 1 Mine JDM <br />The East Mine Haul Road has been narrowed to the current configuration. All surface drainage is directed to the <br />roadside ditch on the uphill side of the road by water bars. The ditch flow is then directed out of the ditches and <br />into Ditch 7, a drainage that runs parallel to the west side of the West Ridge Waste Pile, and out of the affected <br />area west of the West Ridge Waste Pile. The East Mine Haul Road was stable with no problems noted. <br />All roads associated with the Loadout area and the East Mine were stable and accessible during the inspection with <br />no problems noted. <br />�YiI �II):711 fa/[r//QYi/�1L7 S:i���ll� <br />The Paonia Loadout continues to be utilized by Bowie Resources as a storage facility for mine related material <br />from the Bowie No. 2 Mine. The Loadout was stable with no problems noted. As noted in the Hydrologic <br />Balance section of this report, the north side clear water ditch has recently been cleared and is stable. <br />A portion of the railway gravel ballast has been removed and the gravel was stockpiled on site during the <br />inspection. <br />Bowie #1 Loadout <br />DOCUMENTS RECEIVED - None <br />OTHER (SPECIFY) - NA <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 4 of 6 <br />