My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-24_REVISION - M2006046
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006046
>
2016-06-24_REVISION - M2006046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:14 PM
Creation date
6/24/2016 4:43:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006046
IBM Index Class Name
Revision
Doc Date
6/24/2016
Doc Name
Request for Technical Revision
From
Western Slope Materials
To
DRMS
Type & Sequence
TR1
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 shows a breakdown of this worst case scenario. The costs quoted are based on GLA <br />experience and DRMS values from recent evaluations of this site. <br />Table 2 — Worst Case Reclamation Scenario Costs <br />Reclamation Task <br />Comments <br />Reclamation Cost <br />Scales, scale house, & fuel farm <br />' $1,783 <br />Structure demolition <br />Dewatering of Ponds 1B and 2 (880 <br />Cost of roughly $60/ac-ft <br />$52,800 J <br />Backfilling of 1000' of hihwall, <br />Acce tinx DRMS calculation <br />$16,475 <br />Topsoiling (6" deep) of 1000' of <br />Cost of roughly $0.59/CY <br />$655 T w <br />highw_all along its top 60' (1111 CY) <br />Topsoiling (6" deep) of production <br />_ <br />Cost of roughly $0.59/CY <br />r $9,851 <br />area 16 698 CY} <br />yl <br />Seeding and mulching all areas <br />Cost of $2000/acre <br />$44,000 <br />needing reyegetatlon (22 acres) <br />Mobilization of crew and <br />1 <br />$10,723 - -- <br />equipment- <br />Subtotal <br />�r <br />Before indirect costs <br />j $136,287 <br />DRMS Indirect Cost 2596 <br />-- <br />- --- <br />Total <br />- <br />--- ... <br />- <br />$175,810 <br />All mining activity, regardless of phase, is limited to 1000 feet of unbackfilled highwall. Therefore, <br />the maximum possible backfilling needed is that required to take a vertical slope to 311:1 V for a <br />height of 25 feet, and along a distance of 1000 feet. The topsoiling requirements of the site in the <br />worst case reclamation area a combination of the topsoil needed along the 1000 backfilled feet, and <br />the topsoil needed on the production area located in Phase 3A. <br />The bond for the operation should be $175,$10. <br />Please feel free to contact me with any questions. <br />Sincerely, <br />Ben Langenfe(d, P.E. <br />Greg Lewicki and Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.