My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-23_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2016-06-23_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:24:07 PM
Creation date
6/24/2016 10:22:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
6/23/2016
Doc Name
4th Adequacy Letter
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
RN6
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Louis Head <br />Page 2 <br />June 23, 2016 <br />17. To the Division, it appears that the page numbers in the Table of Contents still need to be <br />updated to match the body of the report. Examples of items that appear to be in error: <br />• Section 2.03.4 is on page 2.03-3 rather than 2.03-4. <br />• Some of the sub -sections in Sections 2.05.4, 2.05.5, and 2.05.6 appear to be on different <br />pages than those listed in the new Table of Contents. <br />• Table 20 appears to be on page 2.05-25 rather than 2.05-23. <br />• Tables 24, 25, and 26 appear to be on different pages than shown on the revised table. <br />18. NECC response is adequate. No further response required. <br />19. NECC response is adequate. No further response required. <br />20. NECC response is adequate. No further response required. <br />21. NECC response is adequate. No further response required. <br />22. Map 13 should be updated. <br />23. NECC response is adequate. No further response required. <br />24. NECC response is adequate. No further response required. <br />25. NECC response is adequate. No further response required. <br />26. NECC response is adequate. No further response required. <br />27. NECC response is adequate. No further response required. <br />28. NECC response is adequate. No further response required. <br />29. NECC response is adequate. No further response required. <br />Please feel free to contact me with any questions or comments. <br />Regards, <br />Robert D. Zuber, P.E. <br />Environmental Protection Specialist II <br />Cc: Ron Thompson (via e-mail) <br />
The URL can be used to link to this page
Your browser does not support the video tag.