My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-23_INSPECTION - C1981012
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2016-06-23_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:24:06 PM
Creation date
6/24/2016 8:22:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
6/23/2016
Doc Name
OSM Inspection Report (Emailed)
From
OSM
To
DRMS
Inspection Date
6/7/2016
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S. DEPT. OF THE INTERIOR P"Q'� <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program�x <br />I. rermmeefrerson <br />17. OSM Office N 18. CCID P 19. Land Code <br />140 0 <br />20. M.S,H,A. ID P 21. State Abbrev. 22. Coun /Burrough <br />05.00296 CO usARNIAs <br />23. AVS Permittee Entity ID Number 24. State Office <br />158034 <br />9. Permit Number <br />C-81.012 <br />11. Field Visit Date <br />617ROi6 <br />ma.ai-m. <br />14. Permit Status <br />12. Purpose <br />OC <br />15. Site Status <br />FAN --j <br />10. Permit Type <br />Pp <br />13. SRA Present <br />0 <br />16. Facilit T pe <br />NEW ELK COAL COMPANY LLC <br />2. Address <br />12250IIICIIWAY 12 <br />26. Signature Block <br />l ���/-sz'a- <br />3. Ci 4. State <br />1YESTON I F -CO -10 <br />5. Z1 Code 6. Phone Number <br />81091 (303)300-8718 <br />7, O sitar Name, ifDifferent than Permittee <br />17. OSM Office N 18. CCID P 19. Land Code <br />140 0 <br />20. M.S,H,A. ID P 21. State Abbrev. 22. Coun /Burrough <br />05.00296 CO usARNIAs <br />23. AVS Permittee Entity ID Number 24. State Office <br />158034 <br />NE11' ELK COAL COMPANY LLC <br />8. Mine Name <br />NEW ELK <br />ABI Bond Forreaure Bond forfeiture officially In process orcompleled and raclamalion in <br />25. Hours <br />4.0 a. Permit Review <br />33.0 b. Site Visit Time <br />6,0 c. Travel Time <br />8.0 d. Report Writing <br />progress or not yet commenced. <br />26. Signature Block <br />l ���/-sz'a- <br />27. eviewin Official: <br />���iY1�l� <br />Srgnolure <br />signature <br />Review Date; <br />mmdJ»yy <br />Is Supplemental MSE Page Used YM 0 <br />Christine <br />Belka, IDHIB2 <br />Primed Name <br />Date: 6/23/2016 <br />Cox Oversight RFx. Reclamation Fees CC....ClUzen Compolnt(oiUel alta Neil) w ..... <br />Ass .Assistanm Fxa Federal Acltans erre e..oi.,... <br />Permit Status -Item 14 <br />AB Abandoned AN surface and underground coal mining activities havemased aril operator <br />A Active Coal mining ecllviUea occurring or permitted but not yet <br />has left the site without completing reclamation as defined In 30 CPR 640'11(g) <br />disturbed <br />ABI Bond Forreaure Bond forfeiture officially In process orcompleled and raclamalion in <br />IN Inactive (Permanent Program PerMO. Phase II completed or <br />progress or not yet commenced. <br />Temporary Cessation of Operatons. (Interim Program Permit) <br />ABI Partially Recialmed Forfeiture Forfeited site where all bonds he" been used to farts In site, <br />Coal mirdng completed and reclamation scUflas Initiated. <br />but She not reclaimed to Program standards <br />ER Bond Release: Reclamation completed and Stele Regulatory <br />A03 Reclaimed Fodelture. Forfeited sae that has been reclaimed to Program standards <br />Aulhoriy(RA) hes released all of the bond (Phase III Release), <br />NA Not Applicable When site Is unpernilled. <br />ND No OlsWrbance: No mel min ng end recta me ton <br />Mc Mining Compels• No mining activity on alto alto <br />regraded and awaiting bond mlease <br />NS Non -Sae Vish: Status of Site not determined <br />Forfeiture Pending The RA la Pursuing actions to <br />operations hove been atoned. <br />E% Coal Exploration: Coal exploration operations have <br />TC Temporary Cessation The RA has granted <br />cessation of mWng Pursuant to 30 CFR <br />PP revoke the permit collect the Performance bond(s), <br />started and where mel mining operations have not <br />816181713(b). <br />andfor reclamation of forfeited site u In progress <br />FR Forfeftedand Reclaimed Forfeituraraclematon <br />begun <br />P1 Phase I Releases At least Phase I bond raises& <br />competed. <br />AP Active Cost Producing: Coal Surface mining <br />activities arc occurring. <br />granted or engra permitted area For Interim <br />FO Abandoned Site Abandoned elle that Is permitted but <br />AN Act!" Nan -Producing: Active non -producing facility <br />permits Partial bond release <br />pI Phase II Release Al least Phase II bond mfeaee <br />Mery is no bond. <br />WC Wddrat: Coal mining and reclamation operators have <br />such as tipple or preparaton plant <br />NM No Mining The Permit Status Is acture, site Is not In <br />for the enure permitted area. <br />P3 Phaselll Release Reclametiencompetedand <br />or am laking pace and the activity is not covered by <br />the required permits from the RA <br />Temporary Cessation, no surface coal mining <br />the RA has released all band. <br />activity and site not regraded. <br />Facility Typo Codes - Item 16 0.Ancillary (Haulroed, Conveyor, arMfor Rage H Moomdoo Permits K .... Oovemmenl Financed Construction Exemption <br />A Surface E. Refuse a ndforlmpoundmenl I .Notice of intent to Explore L....Remining site permitted under 30 CFR 765, 25 <br />B .Underground F... Leading Facility andforTlppe J ,Exempt 16 and v3 <br />C Preparation Plant 0,...Stockpiles <br />Small Business Reaulslarx Enforcement Palmate Act ISRREPAI <br />about 1`081e1 epenry <br />Ra (s Geineaa with 500 Or <br />
The URL can be used to link to this page
Your browser does not support the video tag.