Laserfiche WebLink
6/24/2016 State.co.us Executive Branch Mail ­ Re: Inspection r eport for New Elk Mine <br />https://m ail.google.com /mail/u/0/?ui=2&ik=e29129fcb5&view=pt&sear ch=inbox&th=1557f48e57ae3db3&siml=1557f48e57ae3db3 1/1 <br />Hernandez ­ DNR, Alysha <alysha.hernandez@state.co.us> <br />Re: Inspection report for New Elk Mine  <br />1 mes s age <br />Belka, Christine <cbelk a@os mre.gov >Thu, Jun 23, 2016 at 4:00 PM <br />To: "Zuber ­ DNR, Rob" <rob.z uber@s tate.c o.us > <br />Cc: Louis Head <lhead@newelkcoal.c om>, Ron Thomps on <ronthomps on@newelk c oal.com>, Aly s ha Hernandez ­ DNR <br /><aly s ha.hernandez @st ate.co.us > <br />Apologies for the delay. My inspec tion reports for New Elk and Golden Eagle are att ached. Hard c opies  will go out wit h <br />tomorrow's  mail.  <br />Thank  y ou,  <br />Christine Belka <br />Senior Regulatory Progra m Specialist <br />USDOI Office of Surface Mining <br />Reclamation a nd Enforcement <br />Denver Field Divis ion <br />1 999 Broadway, Suite 3320 <br />Denver, Colorado 80202 <br />Office: (303)293­5020  <br />Fa x : (303) 293­5017 <br />Cell: (303) 860­7935 <br />On Wed, Jun 15, 2016 at 10:29 AM, Zuber ­ DNR, Rob <rob.zuber@st ate.co.us > wrote:  <br />Louis  ­  <br />Please s ee the att ached report. I  look forward to work ing with you and y our staff on dev eloping prac tical solutions  to <br />t he iss ues  in t he report. <br />Take c are, <br />Rob <br />Rob Zuber, P.E. <br />Environmental Pr otection Sp ec ialist II <br />Coal Reg ulatory Prog ram <br />  <br />P 303.866.3567, extens ion 8113  |  F 303.832.8106 <br />1313 Sherman Street, R oom 215, Denver, CO  80203 <br />rob.z uber@s tate.c o.us  |  http://mining.s tat e.c o.us <br />2 attachments <br />New Elk 6­7­2016.pdf <br />1853K <br />Golden Eagle 6­9­2016.pdf <br />1455K