My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-23_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2016-06-23_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:24:06 PM
Creation date
6/24/2016 8:22:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
6/23/2016
Doc Name
OSM Inspection Report (Emailed)
From
OSM
To
DRMS
Inspection Date
6/7/2016
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/24/2016 State.co.us Executive Branch Mail Re: Inspection r eport for New Elk Mine <br />https://m ail.google.com /mail/u/0/?ui=2&ik=e29129fcb5&view=pt&sear ch=inbox&th=1557f48e57ae3db3&siml=1557f48e57ae3db3 1/1 <br />Hernandez DNR, Alysha <alysha.hernandez@state.co.us> <br />Re: Inspection report for New Elk Mine <br />1 mes s age <br />Belka, Christine <cbelk a@os mre.gov >Thu, Jun 23, 2016 at 4:00 PM <br />To: "Zuber DNR, Rob" <rob.z uber@s tate.c o.us > <br />Cc: Louis Head <lhead@newelkcoal.c om>, Ron Thomps on <ronthomps on@newelk c oal.com>, Aly s ha Hernandez DNR <br /><aly s ha.hernandez @st ate.co.us > <br />Apologies for the delay. My inspec tion reports for New Elk and Golden Eagle are att ached. Hard c opies will go out wit h <br />tomorrow's mail. <br />Thank y ou, <br />Christine Belka <br />Senior Regulatory Progra m Specialist <br />USDOI Office of Surface Mining <br />Reclamation a nd Enforcement <br />Denver Field Divis ion <br />1 999 Broadway, Suite 3320 <br />Denver, Colorado 80202 <br />Office: (303)2935020 <br />Fa x : (303) 2935017 <br />Cell: (303) 8607935 <br />On Wed, Jun 15, 2016 at 10:29 AM, Zuber DNR, Rob <rob.zuber@st ate.co.us > wrote: <br />Louis <br />Please s ee the att ached report. I look forward to work ing with you and y our staff on dev eloping prac tical solutions to <br />t he iss ues in t he report. <br />Take c are, <br />Rob <br />Rob Zuber, P.E. <br />Environmental Pr otection Sp ec ialist II <br />Coal Reg ulatory Prog ram <br /> <br />P 303.866.3567, extens ion 8113 | F 303.832.8106 <br />1313 Sherman Street, R oom 215, Denver, CO 80203 <br />rob.z uber@s tate.c o.us | http://mining.s tat e.c o.us <br />2 attachments <br />New Elk 672016.pdf <br />1853K <br />Golden Eagle 692016.pdf <br />1455K
The URL can be used to link to this page
Your browser does not support the video tag.