Laserfiche WebLink
Demo Worksheet Cont’d Task # TTT Page 4 of 7 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Task description: Backfill and Grade 10RT Pipeline, MR299 <br />Site: Foidel Creek Mine <br />Permit Action: Backfill and Grade <br />10RT Pipeline Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 6/23/2016 County: Routt Filename: C056-003 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D3K LGP - 3P <br />Horsepower: 74 <br />Blade Type: Power Angle Tilt <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $21.14 NA <br />Operating Cost/Hour: $23.04 100 <br />Ripper own. <br />Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $83.07 <br />Total Fleet Cost/Hour: $166.14 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 3,661 <br />Swell factor: 1.000 <br />Loose volume: 3,661 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly <br />production: <br />169.6 LCY/hr <br /> <br />Materials consistency <br />description: <br />Loose stockpile 1.2 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 7,000 feet <br /> <br />Material weight: 2,100 lbs/LCY