Laserfiche WebLink
Demo Worksheet Cont’d Task # TTT Page 3 of 7 <br /> <br />CIRCES Cost Estimating Software <br />DEMOLITION WORK <br /> <br />Task description: Haul additional CMP Riser for 10RT Pipeline to dump MR299 <br />Site: Foidel Creek Mine Permit Action: MR299 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 6/21/2016 County: Routt Filename: C056-002 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />UNIT COSTS Location adjustment: 95.50 % <br />Structure or <br />Item Description <br /> <br />Dimensions Demolition Menu <br />Selection <br /> <br />Quantity <br /> <br />Unit <br /> <br />Unit <br />Cost <br /> <br />Total Cost <br />CMPRiser Haul <br />Away <br />8' Diameter Loading and 2 mile <br />haul, no salvage - <br />Hand loading <br />2.00 CY $40.40 $80.80 <br /> <br />Job Hours: 0.00 <br />Subtotal <br />(unadjusted): $80.80 <br />Total Cost <br />(adjusted for <br />location): $77.16 <br /> <br />