Laserfiche WebLink
COST SUMMARY WORK <br /> <br />Task description: Additional 10RT Pipeline Reclamation MR299 <br />Site: Foidel Creek Mine Permit Action: MR299 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 6/21/2016 County: Routt Filename: C056-000 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Cut-off/Cap additional 10RT Pipeline and CMP <br />Riser MR299 <br />BOREHOLE 1 0.00 $460.58 <br />002 Haul additional CMP Riser for 10RT Pipeline to <br />dump MR299 <br />DEMOLISH 1 0.00 $77.16 <br />003 Backfill and Grade 10RT Pipeline, MR299 DOZER 2 13.19 $2,192.00 <br />004 Revegetation of 10RT Pipeline Corridor REVEGE 1 3.80 $2,297.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />16.99 <br /> <br />$5,027 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $101.55 <br />Performance bond: 1.05 Total = $52.78 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $502.70 <br /> TOTAL O & P = $657.03 <br /> CONTRACT AMOUNT (direct + O & P) = $5,684.03 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.00 Total = $227.36 <br />Reclamation management and/or administration: 3.13 $177.91 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $1,062.30 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $6,089.30 <br /> <br />