Laserfiche WebLink
6/24/2016 State.co.us Executive Br anch M ail ­ MR299; Cost Estimate; Foidel Creek M ine, C­1982­056 <br />https://m ail.google.com /mail/u/0/?ui=2&ik=e29129fcb5&view=pt&sear ch=inbox&th=1557f4c1e67212a2&siml=1557f4c1e67212a2 1/1 <br />Hernandez ­ DNR, Alysha <alysha.hernandez@state.co.us> <br />MR299; Cost Estimate; Foidel Creek Mine, C­1982­056  <br />1 mes s age <br />Ebert ­ DNR, Jared <jared.ebert @st ate.co.us >Thu, Jun 23, 2016 at 4:05 PM <br />To: J erry  Net tleton <jnett leton@peabodyenergy.c om> <br />Cc: Aly s ha Hernandez ­ DNR <aly s ha.hernandez @s tate.c o.us > <br />Hello Jerry, <br />I hav e reviewed t he MR299 s ubmittal and I do not have any  f urther adequac y  review items .  However, the applic ation <br />indicated t hat the current  bond cov ers the rec lamation of the 10RT pipeline corridor.  Upon review of  t he c os t estimate, I <br />did not see that  t hese c osts  were inc luded.  Giv en t his , I hav e c onducted a rec lamation c os t estimate for t his  projec t <br />that includes a cost  f or backfilling and revegetating the corridor.  The estimate is  attached.  Pleas e review and let me <br />k now if y ou c onc ur wit h t he es timate.  <br />Thank s, <br />J ared <br />­­  <br />Jar ed Eber t <br />Environmental Pr otection Sp ecialis t  <br />P 303.866.3567 ex t. 8120 |  F 303.832.8106 |  <br />1313 Sherman St., Room 215, Denver, CO 80203 <br />jared.ebert@state.c o.us | mining.st ate.co.us <br />MR299_CostE stiamte.pdf <br />242K