Laserfiche WebLink
CHANGE SHEET FOR PERMIT REVISIONS, TECHNICAL REVISION, AND MINOR REVISIONS <br />Mine Company Name: New Horizon Mine Permit Number: C-1981-008 <br />Date: June 21, 2016 Revision Description: MR -100 - Update Determination of <br />Bond Amount in Section 3.02.2 <br />Volume Page, Map or other Permit Entry to Page, Map or other Permit Entry to <br />Number be be <br />REMOVED ADDED <br />Description of Change <br />1 <br />N/A <br />N/A <br />No Change <br />2 <br />N/A <br />N/A <br />No Change <br />3 <br />N/A <br />N/A <br />No Change <br />4 <br />N/A <br />N/A <br />No Change <br />5 <br />N/A <br />I N/A <br />INo Change <br />6 <br />N/A <br />N/A <br />No Change <br />7 <br />N/A <br />N/A <br />No Change <br />8 <br />Section 3.02.2: Determination of Bond <br />Section 3.02.2: Determination of Bond <br />Remove Coal Self -Bond and Estimated Reclamation Cost and replace with <br />Amount Cover TOC pages 1-10 12 <br />Amount Cover, pages 1-186 187 pages) <br />DRMS Reclamation Cost Estimates for SL -16 TR -69 TR -70 and SL -17 <br />8 <br />Map 3.02.2-1: Perimeter Road and Box Cut <br />N/A <br />Remove Map 3.02.2-1 since all information in Section 3.02.2 is being <br />Spoil Ditches BB Detour Road <br />Ireplaced with updated RCE's <br />8 <br />Map 3.02.2-3: Fence Diagram for Cut 88 <br />N/A <br />Remove Map 3.02.2-3 since all information in Section 3.02.2 is being <br />replaced with updated RCE's <br />8 <br />Map 3.02.2-4: Bond Calculation for Mine <br />N/A <br />Remove Map 3.02.2-4 since all information in Section 3.02.2 is being <br />Cut 88 <br />replaced with updated RCE's <br />8 <br />Map 3.02.2-5: Bond Calculation for Ramp 1 <br />N/A <br />Remove Map 3.02.2-5 since all information in Section 3.02.2 is being <br />replaced with updated RCE's <br />8 <br />Map 3.02.2-6A: Proposed Phase 2 Bond <br />N/A <br />Remove Map 3.02.2-6A since all information in Section 3.02.2 is being <br />Release Area <br />re laced with updated RCE's <br />8 <br />Map 3.02.2-7: BB Road Detour Plan and <br />N/A <br />Remove Map 3.02.2-7 since all information in Section 3.02.2 is being <br />Profile <br />re laced with updated RCE's <br />8 <br />Map 3.02.2-8: BB Road Detour Cross- <br />N/A <br />Remove Map 3.02.2-8 since all information in Section 3.02.2 is being <br />I <br />Sections <br />replaced with updated RCE's <br />8 <br />Map 3.02.2-9: BB Detour Road Fill and <br />N/A <br />Remove Map 3.02.2-9 since all information in Section 3.02.2 is being <br />Topsoil Stockpiles <br />re laced with updated RCE's <br />8 <br />Map 3.02.2-10: Mt. Nucla Out of Pit <br />N/A <br />Remove Map 3.02.2-10 since all information in Section 3.02.2 is being <br />Stockpile <br />re laced with updated RCE's <br />8 <br />Attachment 3.02.2-1: New Horizon 1 <br />N/A <br />Remove Attachment 3.02.2-1 since all information in Section 3.02.2 is being <br />Reclamation Bond Calculations <br />replaced with updated RCE's <br />8 <br />Attachment 3.02.2-2: New Horizon Mine 2 <br />N/A <br />Remove Attachment 3.02.2-2 since all information in Section 3.02.2 is being <br />Reclamation Bond Calculations <br />replaced with updated RCE's <br />8 <br />Attachment 3.02.2-3: WFC Landowner <br />N/A <br />Remove Attachment 3.02.2-3 since all information in Section 3.02.2 is being <br />Letter (Request Retention of Structures <br />replaced with updated RCE's <br />8 <br />Attachment 3.02.2-4: San Miguel Power <br />N/A <br />Remove Attachment 3.02.2-4 since all information in Section 3.02.2 is being <br />Cost Estimate for Power Line Installation <br />re laced with updated RCE's <br />8 <br />Attachment 3.02.2-5: Nucla-Naturita <br />I <br />N/A <br />I <br />Remove Attachment 3.02.2-5 since all information in Section 3.02.2 is being <br />Tele hone Company Cost Estimate <br />I replaced with updated RCE's <br />