My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-17_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-06-17_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:54 PM
Creation date
6/20/2016 1:00:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/17/2016
Doc Name
Adequacy Review Response
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
TR115
Email Name
JLE
DIH
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont’d Task # TTT Page 4 of 16 <br /> <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br /> <br />Task description: Replace additional Topsoil on KLM/G Pit - TR115 <br />Site: Trapper Mine Permit Action: TR115 Permit/Job#: C1981010 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 6/16/2016 County: Moffat Filename: C010-002 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: Cat D10T - 10SU <br />-Dump Area: Cat D10T - 10SU <br />Road Maintenance –Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 2,500 Gal. <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA 100 100 100 50 <br />Ownership cost/hour: $148.54 NA $145.63 $145.63 $79.03 $7.71 <br />Operating cost/hour: $192.54 NA $134.61 $134.61 $69.17 $9.53 <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br />Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour: $34.24 NA $38.89 $38.89 $35.83 $29.42 <br />Unit Subtotals: $375.32 NA $319.13 $319.13 $184.03 $46.66 <br />Number of Units: 8 0 1 1 1 1 <br />Group Subtotals: Work: $3,002.56 Support: $638.26 Maint: $230.69 <br />Total work team cost/hour: $3,871.51 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 248,453 CCY Swell factor: 1.000 <br />Loose volume: 248,453 LCY <br />Source of estimated volume: TR115; Adequacy Review Response - Estimate <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Top Soil Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.