Laserfiche WebLink
Borehole Worksheet Cont’d Task # TTT Page 5 of 16 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br /> <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 6400 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />NA <br />Travel Time: <br /> Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res (%) Total Res (%) Velocity (fpm) Travel Time (min) <br />1 1869.00 -0.92 3.00 2.08 2939 0.84 <br />Haul Time: 0.84 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res (%) Total Res (%) Velocity (fpm) Travel Time <br />(min) <br />1 1869.00 0.92 3.00 3.92 2910 0.80 <br />Return Time: 0.80 minutes <br />Total Scraper team cycle time: 3.24 minutes <br />Adjusted for job conditions: 891.48 LCY/Hour <br />Selected Number of Scrapers: 8 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 3,565.93 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 3,565.93 LCY/Hour <br />Unadjusted unit production/hour: 1,074.07 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 69.67 Hours <br /> <br />Unit cost: <br /> <br />$1.086 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$269,744 <br /> <br /> <br />