My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-17_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-06-17_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:54 PM
Creation date
6/20/2016 1:00:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/17/2016
Doc Name
Adequacy Review Response
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
TR115
Email Name
JLE
DIH
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont’d Task # TTT Page 5 of 16 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br /> <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 6400 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />NA <br />Travel Time: <br /> Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res (%) Total Res (%) Velocity (fpm) Travel Time (min) <br />1 1869.00 -0.92 3.00 2.08 2939 0.84 <br />Haul Time: 0.84 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res (%) Total Res (%) Velocity (fpm) Travel Time <br />(min) <br />1 1869.00 0.92 3.00 3.92 2910 0.80 <br />Return Time: 0.80 minutes <br />Total Scraper team cycle time: 3.24 minutes <br />Adjusted for job conditions: 891.48 LCY/Hour <br />Selected Number of Scrapers: 8 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 3,565.93 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 3,565.93 LCY/Hour <br />Unadjusted unit production/hour: 1,074.07 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 69.67 Hours <br /> <br />Unit cost: <br /> <br />$1.086 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$269,744 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.