Laserfiche WebLink
sites except L, M, and D are considered reclaimed and have at least 80 percent growth. Site <br /> D will probably be 80%regrowth at the end of 2016. Currently, it is at 60%. <br /> Proposed 2016 Operations: <br /> Operations will be in conjunction with operations on Glacier Peak Mining claims, Quist <br /> Exploration, Crystaljack Mining, and American Dream Exploration. Operations will <br /> commence in early June and extending through July with additional days in August or <br /> September as required for reclamation. A John Deere 992 and/or 350 track hoe will be <br /> predominantly used. <br /> Site G and Site H will continue to be opened and worked for a total of 0.4 acre. At <br /> completion of mining, they will be made safe for winter. <br /> Anticipated 2016 Disturbances: <br /> An additional 0.40 acre will be opened at Sites G and Site H. <br /> Proposed 2016 Reclamation: <br /> No reclamation is proposed until Site G and Site H are completed. <br /> Sufficiency of Bond: <br /> A reclamation bond of$ 17,693 is set aside with the State of Colorado for this permit. An <br /> additional $11,195 is set aside with the U.S.F.S. to cover any reclamation of roads. <br /> Respectfully submitted, <br /> ( <br /> JOSEPH L. DORRIS 1 Attch. <br /> Operator/Agent, T. D. Minerals Mining 1. Site map with photos <br />