My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-14_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-06-14_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:34 PM
Creation date
6/15/2016 10:14:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
6/14/2016
Doc Name
Update Cost Estimate from Informal Conference
From
DRMS
To
Twentymile Coal Company
Type & Sequence
SI2
Email Name
JLE
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Cost Summary <br />Site: Foidel Creek Mine Permit Action: SI2 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 06/10/2016 County: Routt Filename: C056-000 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br /> Earthwork – Backfilling and Rough Grading <br />001 Backfill and Regrade Portal/Office Area DOZER 3 476.40 $456,101.00 <br />002 Regrade Shop/Warehouse/Parking/Stoker Areas DOZER 1 118.37 $37,776.00 <br />003 Regrade and Rip Waste Rock Pad and Adjacent <br />Areas <br />DOZER 1 149.96 $51,184.00 <br />004 Regrade and Rip Tipple, Stockpile Pads and <br />Substation Areas <br />DOZER 1 176.77 $60,337.00 <br />005 Regrade and Rip Explosives Bunker and Storage <br />Area <br />DOZER 1 9.54 $3,256.00 <br />006 Regrade and Rip Rail Loop Corridor DOZER 1 12.09 $4,125.00 <br />007 Regrade and Rip East Mine Area PM Bay, <br />Laydown Area <br />DOZER 1 40.62 $13,865.00 <br />008 Regrade and Rip "Brown Palace" Office Area DOZER 1 4.77 $1,627.00 <br />009 Regrade and Rip Training Center Area DOZER 1 4.99 $1,703.00 <br />010 Regrade, Spread Gravel Pad and Rip Rock Dust <br />Tank Area <br />DOZER 1 0.91 $310.00 <br />012 Regrade and Rip Fish Creek Borehole Area and <br />Treatment Ponds <br />DOZER 1 44.61 $15,226.00 <br />013 Regrade Batch/Weigh/Loadout System DOZER 1 79.36 $25,326.00 <br />014 Regrade 10RT Pad DOZER 1 9.29 $2,966.00 <br />016 Regrade and Rip 6 North Main Pad DOZER 1 8.24 $2,757.00 <br />018 Backfill and Regrade West Haulroad Truck Scale <br />Foundation an <br />DOZER 1 0.48 $154.00 <br />019 Backfill and Regrade Truck Loadout and Tunnel DOZER 1 7.42 $2,367.00 <br />020 Backfill and Regrade Wash Plant II Area DOZER 2 16.48 $11,015.00 <br />021 Regrade 18 Left Pad and Road DOZER 1 20.52 $6,855.00 <br />022 Regrade 6 North Main Pipeline Corridor, Road <br />Corridor, and D <br />DOZER 1 11.07 $3,699.00 <br />023 Regrade 6 Right Thickener Underflow Pad, Road, <br />and Corridor <br />DOZER 1 13.17 $4,402.00 <br />024 Regrade 18 Left Trench Increments DOZER 1 0.18 $56.00 <br />025 Regrade 19 Right Pad and Ditch Increments DOZER 1 1.15 $368.00 <br />026 Regrade 16L Grout Borehole Pad and Access Road DOZER 1 10.55 $3,526.00 <br />027 Regrade Drill Pads an Mud Pits Exploration Holes <br />TWC001-007 <br />DOZER 1 2.57 $859.00 <br />028 Regrade 6 North Main Pipeline Corridor and Relief <br />Drain <br />DOZER 1 1.21 $405.00 <br />029 Regrade Additional 16LT Road Disturbance DOZER 1 6.94 $2,313.00 <br />030 Regrade Drill Pad and Mudpits for Exploration <br />Holes TCW008-0 <br />DOZER 1 1.91 $638.00
The URL can be used to link to this page
Your browser does not support the video tag.