My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-20_GENERAL DOCUMENTS - C1981035
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981035
>
2016-05-20_GENERAL DOCUMENTS - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:22:22 PM
Creation date
6/15/2016 9:46:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
5/20/2016
Doc Name
Citizen Complaint Federal Permit No. CO-0106A
From
Wild Earth Guardians
To
OSM
Permit Index Doc Type
General Correspondence
Email Name
DIH
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IX. AGENCY COMMENTS <br />Agency request for comments were mailed on January 29, 2014, with an invitation for revised comments sent <br />on December 29, 2015. <br />1. Colorado Division of Reclamation, Mining and Safety <br />Submitted the following comments in an email dated August 6, 2012: <br />"The Division of Reclamation, Mining and Safety has reviewed the Agency Request for Comment, with the <br />attached Narrative and Site Plan for this project. Thank you for soliciting our input. The Division has no <br />comments to make regarding GCC Energy's proposed plans for expansion of the King II Coal Mine. " <br />Marcia Talvitie <br />2. CDOT <br />Submitted the following comments in an email dated August 31, 2015: <br />CDOT has reviewed GCC's Class II proposal to La Plata County and has the following comments: <br />1. The State Highway Access Permit for this facility (9513005), while not yet completed, remains in <br />effect until July 2016. The Terms & Conditions remain as stated in the permit (copy attached for <br />your convenience). <br />2. In April 2015, the Permittee obtained an interim Notice to Proceed for tree -trimming and signing to <br />provide a safer interim condition while production at the mine ramps up to its full capacity which <br />will require the highway improvements stated in the Access Permit. <br />3. The Permittee advises CDOT that the highway improvements required by the Access Permit (left - <br />and right -turn deceleration lanes from SH 140 onto CR 120) are scheduled for completion in 2016 <br />4. The Permittee has submitted preliminary construction plans for the highway improvements, and will <br />still need to submit the remaining requirements for a Notice to Proceed prior to beginning <br />construction. <br />5. The Class II proposal does not appear to change any of the conditions addressed by the State <br />Highway Access Permit; therefore, CDOT has no objections to this proposal. <br />6. CDOT would like there to be a requirement for a luminaire at the intersection of SH 140 and CR <br />120. " <br />- Jo Heinlein <br />3. Colorado Geoloaic Survey <br />Submitted revised comments in a letter dated August 21, 2015 (Attachment 40) <br />4. Division of Water Resources - State Enaineer <br />Submitted comments in a letter dated August 7, 2012 (Attachment 41) <br />5. Fort Lewis Mesa Fire Protection District <br />Submitted comments in a letter dated January 15, 2016 (Attachment 42) <br />6. Fort Lewis Mesa Planning District <br />Submitted comments in a letter dated September 9, 2016 (Attachment 43) <br />7. La Plata County Building Deot. <br />Submitted the following comments in an email dated July 27, 2012: <br />"In reference to GCC Energy King Coal II Mine Class II. All new construction shall meet 2003 IBC and <br />be done by a licensed design professional with a code analysis. " Carter Anderson <br />Project No. 2012-0089 PC <br />4852-5627-2942, v. 3 <br />Page 28 of 32 <br />(DM, VS, DP) <br />
The URL can be used to link to this page
Your browser does not support the video tag.