My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-10_REVISION - C1980007 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2016-06-10_REVISION - C1980007 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:24 PM
Creation date
6/15/2016 6:56:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
6/10/2016
Doc Name
Request for Assistance
From
Clayton Wein
To
Leigh Simmons
Type & Sequence
TR138
Email Name
CCW
DIH
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: West Elk Mine <br />BULLDOZER WORK <br />Regrade Light -Use Roads for drill pad in TR -138 <br />Permit Action: TR138 Permit/Job#: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 6/10/2016 <br />User: CCW <br />State: Colorado <br />County: Gunnison <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C007-001 <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$10.74 <br />NA <br />$6.60 <br />100 <br />$38.89 <br />NA <br />$257.31 <br />$257.31 <br />MATERIAL QUANTITIES <br />Initial Volume: 156 <br />Swell factor: 1.125 <br />Loose volume: 176 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />125 feet <br />1,055.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude <br />Material weight: <br />10% <br />8,000 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />
The URL can be used to link to this page
Your browser does not support the video tag.