My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-10_REVISION - C1980007 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2016-06-10_REVISION - C1980007 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:24 PM
Creation date
6/15/2016 6:56:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
6/10/2016
Doc Name
Request for Assistance
From
Clayton Wein
To
Leigh Simmons
Type & Sequence
TR138
Email Name
CCW
DIH
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summary TR -138 <br />Site: West Elk Mine Permit Action: TR138 Permit/Job#: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 6/10/2016 County: Gunnison <br />User: CCW <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C007-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Regrade Light -Use Roads for 3 Longwall Panel E6 <br />DOZER <br />1 <br />0.45 <br />$117.00 <br />Total = $0.00 <br />Drill Pads <br />002 <br />To soil to Li ht -Use Road for TR -138 <br />DOZER <br />1 <br />0.29 <br />$75.00 <br />003 <br />teace <br />dcast Seed Mix #1 on Light -Use Road for TR- <br />REVEGE <br />7 <br />1 <br />1.00 <br />$330.00 <br />SUBTOTALS: <br />1.74 <br />$522 <br />INDIRECT COSTS <br />$10.54 <br />OVERHEAD AND PROFIT: <br />$5.48 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />0.87 <br />Profit: <br />10.00 <br />Total = <br />$10.54 <br />Total = <br />$5.48 <br />Total = <br />$64.80 <br />Total = <br />$52.20 <br />TOTAL O & P = <br />$133.02 <br />CONTRACT AMOUNT (direct + O & P) = <br />$655.02 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00 <br />Total = $26.20 <br />Reclamation management and/or administration: <br />3.13 <br />$20.50 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $179.72 <br />TOTAL BOND AMOUNT (direct + indirect) = $701.72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.