Laserfiche WebLink
TR -116 Response Cont. <br />Page 2 of 2 <br />has traditionally differentiated the worst case bond scenario plans on Map M 10 and the <br />ARR maps as stated above and have stripped within the allotted areas for the permit term <br />in years past. <br />Adequacy review comments to TR -115 have included bond liability calculations for the <br />anticipated additional stripping for the remainder of the permit term. <br />Please contact me if you have any additional questions regarding the enclosed <br />information. <br />Sincerely, <br />4 a-_....... <br />Graham Roberts <br />Environmental Engineer <br />GCR <br />M:\ANNUALRPT\DRMS15RYnTR-116 Responsel Letter.DOC <br />Enclosure <br />File 109.2.3.4, w/o enc <br />Shelf Binder w/enc <br />