Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Haul topsoil to interior access roads <br />Site: Keenesburg Strip Mine Permit Action: RN7 Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: E05 State: Colorado Abbreviation: None <br />Date: 6/8/2016 County: Weld Filename: E05 <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer:. NA <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauinment Maintenance Eauinment <br />Total work team cost/hour: $1,334.22 <br />MATERIAL OUANTITIES <br />Initial volume: 15,488 CCY <br />Loose volume: 16,417 LCY <br />Source of estimated volume: 2008 ARR <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,850 lbs/LCY <br />Material description: Sand - Damp <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 28.63 LCY <br />Swell factor: 1.060 <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />25 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$148.54 <br />NA <br />$97.48 <br />$97.48 <br />$53.53 <br />$11.19 <br />Operating cost/hour: <br />$192.54 <br />NA <br />$25.90 <br />$103.60 <br />$14.18 <br />$7.82 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$40.86 <br />NA <br />$39.87 <br />$39.87 <br />$40.67 <br />$38.75 <br />Unit Subtotals: <br />$381.94 <br />NA <br />$163.25 <br />$240.95 <br />$108.38 <br />$57.76 <br />Number of Units: <br />2 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$763.88 <br />Support: <br />$404.20 <br />Maint: <br />$166.14 <br />Total work team cost/hour: $1,334.22 <br />MATERIAL OUANTITIES <br />Initial volume: 15,488 CCY <br />Loose volume: 16,417 LCY <br />Source of estimated volume: 2008 ARR <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,850 lbs/LCY <br />Material description: Sand - Damp <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 28.63 LCY <br />Swell factor: 1.060 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />