Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.700 <br />(FND-MF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.807 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3517 <br />Adjusted unit 658.38 LCY/hr <br />production: <br />Adjusted fleet 658.38 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.366/LCY <br />Total job time: <br />Total job cost: <br />0.60 Hours <br />$144 <br />