Laserfiche WebLink
Twentymile Coal, LLC <br />SOW — 9 East Bleeder Exhauster Borehole <br />August 6, 2015 <br />TC RESPONSIBILITIES <br />1. Secure all required permits and MSHA drilling plans. <br />2. Provide onsite hazard training necessary for contract personnel to operate on the surface. <br />3. Provide initial surveying and target for borehole location. <br />4. Provide a 200' x 200' level site pad. <br />5. Provide all casing pipe for the borehole except the surface conductor casings. <br />6. Provide water from the stock pond located just within 1 mile and just SE of the proposed drilling site <br />7. TC shall reclaim the site after each BH is drilled. <br />CONTRACTOR'S RESPONSIBILITIES <br />1. The Contractor shall comply with all applicable federal, state, and local laws, regulations, codes, and ordinances. <br />2. The Contractor shall furnish a list of all Contractor personnel to be associated with the project. <br />3. The Contractor shall be responsible for the safety of all Contractor personnel on, in, and around TC property. <br />The Contractor shall be responsible for providing a water tank if needed. Bethel Trucking has holding tanks available for water <br />storage. Phil at Bethel Trucking can be contacted at 970-824-4923. <br />5. The Contractor personnel shall wear eye protection, hard hats, steel toed safety boots with metatarsals, reflective leg bands and <br />reflective vests as well as any other required safety equipment at all times when on TC property. <br />6. The Contractor shall provide all materials, equipment, tools, services, insurance, and supervision for all activities as required by <br />these specifications and parameters. <br />7. The contractor shall provide for all compressed air needs. <br />8. The contractor shall provide for all diesel fuel needs. Trevco services the area and can be contacted at 970-824-5311. <br />9. The contractor shall provide for all welding needs. <br />10. The contractor shall provide for all portable toilet needs. Herod Industries services the area and can be contacted at 970-824- <br />8305. <br />11, The Contractor shall warrant that all work to be performed and all materials and equipment to be furnished for the job are free of <br />defects for a minimum period of 1 year from the date of final acceptance of the work. The Contractor shall repair or replace any <br />defective materials and workmanship that may occur within the warrantee period at Contractor's expense. <br />12. The Contractor shall submit a schedule based upon the date the site is available for construction that defines the Contractor's <br />required timing to successfully complete the project. <br />13. The Contractor shall be responsible for final clean up of the site and materials used both during and after completion of the job. <br />Bleeder Exhauster BH SOW 9 East 080615.doc Page 4 <br />