Twentymile Coal, LLC <br />SOW — 9 East Bleeder Exhauster Borehole <br />August 6, 2015 <br />10. 16" OD — Exhauster BH Pipe: <br />a. Recommended method of drilling to minimize water inflow — flooded reverse drilling. <br />b. This borehole will also intersect the caved areas with rock rubble of the previously mined Wadge seam longwall panel at <br />approximately 960' to 975' of drilling depth. <br />c. Drilling to the total depth of 1150' shall intersect the coal in an area that has not been underground mined. <br />d. Drilling of the Is' smaller BH will provide an indication of water inflows for this 2nd BH. <br />e. Because of the possibility of the BH producing water, the surface casing for this BH should be oversized to <br />approximately 32" OD as appropriate for the potential of drilling and reaming to a 30" diameter hole to accept a 24" OD <br />schedule 40, weldable or T&C steel pipe to seal off the water. <br />/r f. This first BH shall first be drilled to an approximate diameter of 22", hopefully to the full depth of l 150' without <br />encountering significant water inflows. <br />g <br />Should water not be encountered, the 16" OD, schedule 40, weldable or T&C steel pipes should be installed and grouted <br />in place to a depth of approximately 1150. <br />h. Sealing off water Option l — Should water be encountered — assume this to be at a depth of 700' for bidding purposes: <br />i. In lieu of casing to seal off the water, spot a cement plug at the water inflow interval and drill out the cement <br />plug. <br />i. Sealin2off water Option 2water Option 2 - Should water be encountered and the Option 1 cement plug not seal off the water - assume <br />this to be at a 700' depth for bidding purposes — the 22" hole should then be reamed to a 30" diameter to the 700' depth. <br />j. A 24" OD, schedule 40, weldable or T&C steel casing would then be installed and grouted to seal of off the water. <br />k. Assuming 700' of 24" OD, schedule 40, weldable or T&C steel pipe is installed and grouted to seal off the water, drill <br />the remaining depth to the bottom of the Wolf Creek seam at an approximate diameter of 22". <br />I. Install and grout off approximately 1 ] 50' of 16" OD, schedule 80, weldable or T&C steel pipe. <br />m. TC will provide all steel pipe except the surface casings. <br />11. This hole will not be directionally drilled. <br />12. The contractor shall provide for all compressed air and water delivery needs. <br />13. Water will be available from a stock pond located just within 1 mile and just SE of the proposed drilling site. <br />14. An oversized cuttings pit will be provided for the drill cuttings. <br />15. Contractor shall provide the size(s) for any drilling fluid pits. <br />16. After each site's drilling is complete, TC will arrange for pumping out and hauling away of any waters left in the cuttings pit. <br />17. The cuttings pit will be dried and leveled off before the site is reclaimed. <br />18. TC will be responsible for the final reclamation of the site pad. <br />General Provisions <br />Technical questions should be addressed to Michael Berdine at (970)-870-2782 or Jon Bobbera (970)-870-2789. <br />Contractor to provide a detailed, itemized bid on all aspects of this scope of work the Contractor intends to perform. TC prefers a <br />complete packaged bid from each Contractor. <br />Contractor to provide time line for completion of work outlined in this document. <br />The winning bidder will receive a "not to exceed" amount Purchase Order. <br />It is anticipated that MSHA will require us to remove all persons from the mine while drilling tools are advanced, starting 50' <br />above the original Wadge seam roof (-935' drilling depth) and until the drilling intercepts the bottom of the Wolf Creek coal <br />seam. TC will work with the contractor to schedule this portion of the drilling such that it happens near a shift change. <br />The contractor's quote should therefore account for about 20 hours of standby time to allow for the removal of all persons from <br />the mine on multiple occasions. <br />Contractor must maintain all equipment and materials on the provided pad, including drill cuttings and drilling water. Nothing <br />can leave the 200' by 200' site pad. <br />ttachments: <br />1. Exhibit 1 — Location Drawing <br />2. Exhibit 2 — Typical Lithology <br />Bleeder Exhauster BH SOW 9 East 080615.doc Page 3 <br />